Ships Canada-wide 🍁 Free shipping over $75 · Buy 3+ save 15% automatically

A Canada-Wide Stand · Alberta is the Frontline

No DataCentres

Canada's power belongs to Canadians — not to hyperscale data centres.

$13B Meta Build • 1 Gigawatt • Sturgeon County • 33 Football Fields • 92% of Canada's planned capacity • 

Deck out the whole family

Buy 3+ save 15% automatically at checkout

Canada is not a
server farm.

A $13 billion Meta data centre is being built in Sturgeon County, Alberta — a 1 gigawatt campus that could hold 33 football fields. Alberta is ground zero, but it's a Canada-wide problem: the province now holds the large majority of the country's planned data-centre capacity. Power prices are already under pressure. Communities were barely consulted.

$13B
Meta build
1 GW
Campus power
33
Football fields
92%
Of Canada's planned capacity

Why we exist

Power rates

Hyperscale campuses draw gigawatt-scale loads. Grid upgrades don't come free — and in deregulated markets, ratepayers can end up carrying the cost of infrastructure built to serve foreign tech giants.

Water & land

Cooling a 1 GW campus consumes water and locks up land near power and fibre corridors — often the same rural land that grows food, holds ecosystems, and belongs to communities that were barely at the table.

Consultation

Approvals move fast. Public hearings move slow. When a single facility touches the size of 33 football fields, the people next door deserve more than a press release and a ribbon-cutting.

Your town next?

Tell us where the next fight is. If it's got a proposed campus, a substation buildout, or a council vote coming — we'll design a shirt for it.

FAQ

Because hyperscale AI data centres consume enormous amounts of electricity, water, and land — and the tab often lands on ratepayers and communities who were barely consulted. We're not against technology. We're against Canadians subsidizing foreign infrastructure at their own expense.

Get the next drop first

New designs, new towns, restocks. No spam.